Marlec have just completed a renewable lighting system for one of the UK’s leading high street retailers, Next PLC.
We are asked to design and install car park lighting to illuminate a site which was previously unused during the winter months due to lack of mains power.
Due to the residential location of the site, our standard Wind and Solar powered Green Columns could not be installed as the Windchargers be affected by turbulent wind. A solar only system was designed to power low voltage LED floodlights activated with a PIR.
The installation only took three days to complete to minimise disruption to the car park! Contact David Hibbs or Stuart James at Marlec if you have a bespoke off-grid power requirement, we can be contacted on 01536 201588.